The project is implemented under the Infrastructure and Environment Operational Programme 2014-2020, Measure: 1.1. Supporting the generation and distribution of energy from renewable sources, Sub-Measure: 1.1.1. Supporting investments in the generation of energy from renewable sources and connecting these sources to the distribution/transmission grid.

The project's immediate goal is to utilize solar energy more efficiently by generating electricity through a photovoltaic installation. This will be achieved through the construction of a photovoltaic installation and its connection to the distribution/transmission grid.

The direct result of the project implementation will be:

– Installed capacity – 2,101 MW of electrical power

The product of the project will be a photovoltaic installation generating electricity.

Project carried out by : ZPOW Agros Nova Limited Liability Company Limited Partnership

Place of realization : Łowicz, ul. Sikorskiego 5, 99-400 Łowicz

Total value of the project : 5,766,720.00 PLN

Amount of funding : 2,810,400.00 PLN

Construction of a photovoltaic installation to produce electricity for the production plant in Łowicz | Maspex.com