Construction of a photovoltaic installation to produce electricity for the production plant in Łowicz

The project is implemented under the Infrastructure and Environment Operational Programme 2014-2020, Measure: 1.1. Supporting the generation and distribution of energy from renewable sources, Sub-Measure: 1.1.1. Supporting investments in the generation of energy from renewable sources and connecting these sources to the distribution/transmission grid.
The project's immediate goal is to utilize solar energy more efficiently by generating electricity through a photovoltaic installation. This will be achieved through the construction of a photovoltaic installation and its connection to the distribution/transmission grid.
The direct result of the project implementation will be:
– Installed capacity – 2,101 MW of electrical power
The product of the project will be a photovoltaic installation generating electricity.
Project carried out by : ZPOW Agros Nova Limited Liability Company Limited Partnership
Place of realization : Łowicz, ul. Sikorskiego 5, 99-400 Łowicz
Total value of the project : 5,766,720.00 PLN
Amount of funding : 2,810,400.00 PLN